Our team conducted an Energy Audit at a major NSW Power Station!
For the site service facilities a reduction of 60% of the electricity load was identified without major capital expenditure.Â
This represents a significant annual saving, even for a power station.
Major saving areas were in improved air conditioning controls, reduced lighting cost through scheduling, light sensors and retuning existing on-board energy saving software of electrical equipment.

Over 10% of energy baseload savings identified. We identified 29% cost savings.
Major savings areas identified were in improved logic for pumping controls, increased use of off peak tariffs and process improvements.

JCM Solutions has auditted hundreds of roading, bridge and infrastructure projects across Australia to improve safety and the delivery of key outcomes.

JCM identified many energy savings that could be realised almost immediately with no capital outlay:
• Optimising the schedules in the BMS so air conditioning reflected occupancy
• Adjusting the control logic of the boilers to reduce energy consumption
• Adjusting the control logic of the chillers and improve integration with the boilers
• Fine tuning the settings of the air handling units