Since 2016, JCM Solutions has held accredition with Australian government agencies for providing internationally recognised Independent Measurement and Verification (M&V) services that support carbon credit applications.
We have been providing M&V services to private and public entities for over ten years.Â
Collin Macpherson is also authorised to provide expert reports to government on the carbon reduction projects of third parties seeing carbon credit rebates.
About M&V*
M&V is an internationally accepted protocol determining the Before and After benefits of carbon reduction projects.
M&V is the process of using measurement to reliably determine actual savings created within an individual facility by an energy management program. Savings cannot be directly measured, since they represent the absence of energy use. Instead, savings are determined by comparing measured use before and after implementation of a project, making appropriate adjustments for changes in conditions.
M&V activities consist of some or all of the following:
meter installation calibration and maintenance
data gathering and screening
development of a computation method and acceptable estimates
computations with measured data
reporting, quality assurance, and third party verification of reports
When there is little doubt about the outcome of a project, or no need to prove results to another party, applying M&V methods to calculate savings may not be necessary. However, it is still wise to verify (initially and repeatedly) that the installed equipment is able to produce the expected savings. Verification of the potential to achieve savings is referred to as operational verification, which may involve inspection, commissioning of equipment, functional performance testing and/or data trending. IPMVP adherent M&V includes both operational verification and an accounting of savings based on site energy measurements before and after implementation of a project, and adjustments, as described above.
M&V is not just a collection of tasks conducted to help a project meet IPMVP requirements.
Properly integrated, each M&V task serves to enhance and improve facility operation and maintenance of savings. M&V activities overlap with other project efforts (e.g. collecting data to both identify ECs and establish energy baselines, commissioning and operational verification of installed ECMs, and installing monitoring systems to track and maintain savings persistence, etc.). Identifying these project synergies and establishing roles and responsibilities of involved parties during project planning will support a coordinated team effort. This can leverage complementary scopes and control M&V-related costs.
*International Performance Measurement and Verification Protocol